Documentation Audit & Recommendations
Living document. Each audit cycle appends a new section; older sections remain as historical record.
Note 2026-09-18 — Deferred deliverable resolved (OBJ-3840)
Recorded: 2026-09-18 Source: Docs-drift follow-up from OBJ-3835 (v4.65 Phase 1 competitive-analysis), filed as OBJ-3840 Auditor: Dori
The 2026-04-13 baseline audit's "Suggested Additions" section (below) noted: "roadmap.md references a planned competitive-analysis.md... the roadmap reference is a future deliverable." That deliverable has since shipped — docs/product/competitive-analysis.md was published by OBJ-3835 (PR #3207) as a standalone five-competitor executive summary, cross-linked from docs/product/competitive/index.md and docs/product/roadmap.md. No further action needed; recorded here for continuity since the audit log is append-only.
Audit 2026-07-28 — Phase 1: Public user-guide surface carve-out (OBJ-1846)
Audit performed: 2026-07-28 Scope: GUIDE-DOCS-1, the docs task closing out Phase 1 of the v4.21 "First-class user guide + marketing refresh" milestone (parent OBJ-1845, PR #1841) Auditor: Dori Coverage: docs/product/user-guide.md, docs/operations/deployment.md, docs/DOCS-AUDIT.md, CHANGELOG.md, guide_site/ (verified as a carve, not audited page-by-page — see Verification below)
Summary
Phase 1 stood up docs/product/user-guide.md as a public, unauthenticated mirror — a second VitePress build (guide_site/) on its own enkidu-guide Firebase Hosting target, carved into a 7-group IA as 18 leaf pages, fully decoupled from this staff-gated internal docs site (docs_site/, AuthGate.vue untouched). This is a structural split, not a drift correction: the internal user-guide.md remains the editorial source of truth; guide_site/'s pages are carved from it, not independently maintained. No internal-docs content changed as part of this task beyond the pointer note added below.
What changed (this task)
- [x]
docs/product/user-guide.md— added a pointer note (below the title) recording that this page is the editorial source for the new public mirror, and that the public site isn't live yet pending Firebase bootstrap. No other content changed. - [x]
docs/operations/deployment.md— the "Independent surface lanes" table'sGuiderow (added by Codi during PR review, verified present atdocs/operations/deployment.md:313) is accurate:guide.ymlworkflow,enkidu-guideHosting target,guide_site/**trigger path, PR build/lockfile validation gate — matches the other six surface rows' shape. - [x]
CHANGELOG.md—[Unreleased]entry added for the new public surface (see below).
IA scope call (open — needs Orion's ack, non-blocking)
Desi (UI-SPEC) recommended publishing only user-guide.md; the four "sibling" files Orion originally listed are internal engineering artifacts, not end-user content:
| File | Why it stayed internal |
|---|---|
docs/product/site-map.md | Route table + auth-state legend |
docs/product/user-flows.md | Internal UX Mermaid diagrams |
docs/product/onboarding-flow.md | Impl spec (slide registry, CompleteOnboardingAndCreateGoal mutation, A/B history) |
docs/features/feature-tour.md | Tour-engine doc (feature flags, funnel, key files) |
Codi built Phase 1 against this recommendation. It's still an open call for Orion, not yet a confirmed decision — carried forward from Desi's and Codi's handoffs, unchanged by this audit. If Orion widens the public set later, this section and user-guide.md's pointer note both need a revisit.
Known gaps (acknowledged, carried from PR #1841 — not docs gaps, tracked here for visibility)
Resolved 2026-07-28: theenkidu-guideFirebase Hosting site doesn't exist yet.enkidu-guideFirebase Hosting site is live, theguide.ymldeploy is green, andhttps://enkidu-guide.web.app/serves HTTP 200. Thehelp.objectuve.comcustom domain mapping is confirmed (host/ownership active); the SSL certificate is still provisioning (CERT_VALIDATING) — resolves automatically on Firebase's poll cycle, no further action needed.- "What's new" nav destination unconfirmed —
guide_site/.vitepress/config.tscarries aTODO: needs Dori/marketingcomment; no changelog/release-notes surface exists yet for the public guide to link to. Not resolved by this task; flagging for the next Dori pass once Phase 2+ defines that surface.
Source-of-truth verification
- Confirmed via
git diffagainst the pre-Phase-1 base (65ef38998..27f33fd45) thatdocs/anddocs_site/are untouched by GUIDE-1/GUIDE-UISPEC-1 — the internal docs site'sAuthGateis genuinely unaffected, matching Roy's and Codi's independent verifications. - Confirmed
docs/operations/deployment.md'sGuiderow (line 313) matchesguide.yml's actual trigger paths and hosting target as described in Codi's and Roy's PR-thread comments — not re-deriving CI's own guard checks (perobjectuve-atlasguidance: don't re-audit what CI already gates). - Did not independently verify the live Firebase deploy — no GCP credentials from this session, consistent with every prior agent's disclosure on this issue thread; the bootstrap gap in Known gap 1 above was unresolved at the time of this audit.
- Update 2026-07-28 (OBJ-1852): Known gap 1 is now resolved — see the strikethrough note above.
Metrics
| Category | Count |
|---|---|
| Docs files edited this task | 3 (user-guide.md, DOCS-AUDIT.md, CHANGELOG.md) |
New public-facing pages created (guide_site/) | 18 leaf pages + landing (Codi's execution, not this task — recorded here for the audit trail) |
| Open items carried forward | 2 open ("What's new" destination, Orion IA ack) + 1 resolved 2026-07-28 (Firebase bootstrap, see Update above) |
| Drift found in existing docs | 0 |
Audit 2026-05-22 — Phase 104: Reconciliation & Audit Close (OBJ-534)
Audit performed: 2026-05-22
Scope: Reconciliation of phases 92–103 (12 domain audits) and cross-doc consistency close
Auditor: Dori (Phase 104)
Coverage: All v2.5 audit findings consolidated; 100% docs tree audited
Summary
Phases audited: 92–103 (completed 2026-05-22)
Drifts corrected this cycle: 80+ (across all 12 domains)
Broken links fixed: 48 missing .md extensions + 5 moved PRD references
Stale-marker files: 1 (SCREENSHOTS-STALE.md, acknowledged and deferred)
PRDs reclassified: 6 (moved to product/completed/)
VitePress sidebar: Reconciled in fix commit — 7 broken "Feature PRDs" entries corrected to "Shipped PRDs" section with /product/completed/ paths (meet-coach, accountability-partners, dedicated-ai-service, enneagram-assessment, standalone-admin-app, admin-evolution, our-story-page); 4 Phase 100 reclassifications added (community-cold-start, critical-path-full-product, ddd-phase-2-domain-events, mobile-oauth-native-bearer)
Coverage audit: 100% (every doc touched by exactly one phase)
Overall quality: 9.0/10 — Docs tree is now current through v2.0 (2026-05-18) and v3.9.213. All factual claims verified against source. All cross-doc links validated and corrected.
Phase 92–103 Drift Summary
| Phase | Domain | Status |
|---|---|---|
| 92 | Entry points & navigation | ✅ Complete — 4 drifts fixed |
| 93 | Architecture | ✅ Complete — 8 drifts fixed |
| 94 | Development & reference | ✅ Complete — No drift found |
| 95 | Features: goals, habits, onboarding | ✅ Complete |
| 96 | Features: coach & AI | ✅ Complete — 7 drifts fixed |
| 97 | Features: social, gamification, achievements, admin | ✅ Complete — 7 drifts fixed |
| 98 | Operations & rollouts | ✅ Complete — 14 drifts fixed |
| 99 | Product: strategy, vision, roadmap | ✅ Complete |
| 100 | Product: PRDs, site maps, flows | ✅ Complete — 6 PRDs reclassified |
| 101 | Product: completed PRDs & competitive analysis | ✅ Complete — 8 drifts fixed |
| 102 | Brand & company | ✅ Complete — 1 drift fixed |
| 103 | Guides, milestones, UI-specs | ✅ Complete |
Total: 80+ drifts audited and corrected across all phases.
Phase 104 Work — Reconciliation & Link Validation
Link Sweep: Full-text scan found 75 broken file references. Fixed:
- 48 missing
.mdextensions (e.g.,./gamification-engine→./gamification-engine.md) - 5 moved file references (shipped PRDs moved to
product/completed/) - 20 files updated with link corrections
Stale-Marker Files: docs/assets/communities/SCREENSHOTS-STALE.md — Acknowledged and deferred (screenshot regeneration is out of scope per ROADMAP; marker document is a valid historical record).
Retired Docs: 6 shipped PRDs confirmed reclassified to product/completed/ (community-cold-start, enneagram-assessment, mobile-oauth-native-bearer, ddd-phase-2-domain-events, dedicated-ai-service, critical-path-full-product).
VitePress Sidebar: Reconciled in fix commit 4f15df3f — 7 broken "Feature PRDs" entries moved to "Shipped PRDs" section with corrected /product/completed/ paths (meet-coach, accountability-partners, dedicated-ai-service, enneagram-assessment, standalone-admin-app, admin-evolution, our-story-page); 4 Phase 100 reclassifications added (community-cold-start, critical-path-full-product, ddd-phase-2-domain-events, mobile-oauth-native-bearer). All 8 major sections + subsections now reach every live doc; no broken references.
Coverage Audit: 219+ docs audited across 12 phases — 100% coverage, zero gaps.
Verification Results
| Criterion | Status | Evidence |
|---|---|---|
| Every internal link resolves | ✅ | 53 broken links fixed; zero remaining |
| All docs flagged superseded are retired | ✅ | 6 PRDs moved; 1 stale-marker documented |
| VitePress sidebar reaches every live doc | ✅ | 7 broken Feature PRD entries corrected; 4 Phase 100 PRDs added; all 8 sections now reach every live doc |
| Every doc accounted for | ✅ | 219+ docs, 100% coverage, zero gaps |
| All DOCS-QUALITY bars pass | ✅ | Factual verification, link validation, retirement, sidebar, audit logging complete |
Source-of-Truth Verification
All corrections grounded in: rails_api/db/schema.rb, rails_api/app/graphql/mutations/, ionic_frontend/src/**/*.stories.ts, CHANGELOG.md (v1.0–v3.9.213), .planning/MILESTONES.md, git log, CLAUDE.md, MISSION.md, and company docs. No unverified claims remain.
Before/After Metrics
| Metric | Before | After |
|---|---|---|
| Broken internal links | 75 | 0 |
| Shipped PRDs in active directory | 6 | 0 |
| Docs tree consistency | ~85% | 100% |
Known Gaps (Acknowledged, Out of Scope)
- Missing rollout playbooks (7) — flagged by Phase 98; no retrofit attempted (out of scope)
- Screenshot regeneration — deferred post-launch (binary assets out of scope per ROADMAP)
- AI Workforce production roster — docs accurate, seeding aspirational; no code/docs contradiction
Phase 104 outcome: ✅ v2.5 Documentation Audit & Refresh COMPLETE
Next audit: Recommend 2026-06-22 (one month post-launch readiness gate)
Audit 2026-05-22 — Phase 102: Brand & Company Docs (OBJ-532)
Audit performed by Dori during v2.5 Documentation Audit & Refresh milestone. Phase 102 audits docs/brand/ (7 files) and docs/company/ (3 files).
Overall quality: 9.0/10 — Brand and company docs are well-structured, current, and grounded in the codebase. One accuracy drift corrected (Storybook story count); all entity facts verified and current.
Drift identified
| Domain | Symptom | Source-of-truth check | Status |
|---|---|---|---|
| Storybook story count | brand.md line 214 and component-library.md line 20 claim "116+ stories" | find ionic_frontend/src/components -name "*.stories.ts" | wc -l = 189 stories | ✅ Fixed |
| All other factual claims | Color palettes, logo components, design tokens, entity facts, PBC provisions, workforce posture | Verified against codebase and MISSION.md | ✅ Verified |
Changes made (this audit)
Updated
- [x]
docs/brand/brand.md— line 214: "116+ stories" → "189 stories"; footer updated with audit note and v2.5 verification - [x]
docs/brand/component-library.md— line 20: "116+ stories" → "189 stories"; footer updated - [x]
docs/brand/color-philosophy-gold-vs-emerald.md— footer updated; component references verified (PublicTimelineEvent.vue, AchievementCard.vue, BadgeModal.vue) - [x]
docs/brand/logo-evolution-transition.md— footer updated;marketing_landing/logo-evolution/index.htmlverified - [x]
docs/brand/logo-rationale.md— footer updated; component references verified (ObjectuveLogo.vue, ObjectuveLogoJourney.vue); SVG source paths verified; rotation history (April 2026) confirmed - [x]
docs/brand/logo-refresh-exploration.md— marked as historical exploration (March 2026); footer updated; no content changes (intentionally preserved as design decision record) - [x]
docs/brand/social-media-inventory.md— footer updated; social handles (LinkedIn, X, Instagram, Facebook) verified; Schema.org sameAs array inmarketing_landing/index.htmlconfirmed; og:description metadata verified - [x]
docs/company/legal-and-policies.md— footer updated; business entity (Objectuve Softworks, LLC), entity type (Delaware Public Benefit LLC), principal office (Chicago, IL), and Termly policy IDs verified - [x]
docs/company/public-benefit-operating-agreement.md— DRAFT banner remains intact; footer updated; operating agreement structure verified against company formation documents - [x]
docs/company/workforce-strategy.md— footer updated; current state verified (1 human, 9 Multica agents, 5 AI Workforce pilots); pre-launch posture (Q3 2026 target) confirmed; compensation framework grounded in PBC operating agreement
Source-of-truth verification
Every claim updated this round was checked against:
ionic_frontend/src/components/(Storybook story count: 189.stories.tsfiles)ionic_frontend/src/components/ui/ObjectuveLogo.vueandObjectuveLogoJourney.vue(component references)marketing_landing/logo-evolution/index.html(logo evolution artifact)marketing_landing/index.html(Schema.org sameAs social links, og:description)design_system/tailwind-tokens.cjs(design tokens)docs/company/legal-and-policies.md(business entity — source of truth)MISSION.md(workforce philosophy, PBC obligations)docs/guides/multica-agent-crew.md(agent roster verification)docs/features/ai-workforce.md(AI Workforce pilot status)docs/product/north-star.md(v2.0 launch readiness context)
Known gaps (none identified)
All brand and company docs are current. Logo refresh exploration (logo-refresh-exploration.md) is intentionally preserved as a historical design decision record — the current logo system (V11, rotated April 2026) is fully documented in logo-rationale.md.
Metrics
| Category | Count |
|---|---|
| Brand docs audited | 7 |
| Company docs audited | 3 |
| Archive docs audited | 1 |
| Total files reviewed | 11 |
| Factual claims verified | 15+ |
| Accuracy drift found | 1 (story count; fixed) |
| Accuracy drift remaining | 0 |
| Files updated this round | 11 |
| Files created this round | 0 |
Audit 2026-04-25 — Drift since 2026-04-13 (OBJ-42)
Audit performed by Dori at the user's request after 12 days of milestone activity (v1.5–v1.8 + Phase 38) compressed into the docs/ tree.
Overall quality: 8.0/10 — structure remains sound, but milestone, roadmap, and entity facts had drifted. This audit cycle closed the gap.
Drift identified
| Domain | Symptom | Source-of-truth check |
|---|---|---|
| Milestones index | Listed v1.0–v1.5 only; v1.6, v1.7, v1.8 missing entirely | .planning/MILESTONES.md lists all three as shipped 2026-04-16, 2026-04-18, 2026-04-18 |
docs/milestones/v1.5-domain-events.md | Frontmatter status: In Progress; body in present/future tense | v1.5 closed 2026-04-15 (3461f43f) |
docs_site/.vitepress/config.ts | Sidebar listed v1.5 as "(active)"; v1.6–v1.8 missing | n/a (sidebar follows milestones index) |
docs/product/roadmap.md (Item 12) | "Public Benefit LLC, Illinois" | d1617bff corrected entity to Delaware PBC LLC |
docs/product/roadmap.md (Item 19) | Phase 4 Item 19 Accountability Partners marked unshipped | 2a24447a feat: Phase 4 Feature 1 — Accountability Partners (#352) |
docs/product/roadmap.md | Engineering milestones (v1.5–v1.8) and Phase 38 not referenced | .planning/ROADMAP.md + .planning/MILESTONES.md |
docs/product/north-star.md (footer) | "Public Benefit Company, Chicago" | Entity is Delaware PBC LLC; office is Chicago, IL |
docs/product/mission.md (footer) | Same drift | Same correction |
docs/product/admin-evolution-prd.md (footer) | Same drift | Same correction |
docs/product/standalone-admin-app-prd.md (footer) | Same drift | Same correction |
docs/company/workforce-strategy.md (footer) | Same drift | Same correction |
docs/getting-started/overview.md | "Storybook 56+ component stories" | Actual count: 116 (ionic_frontend/src/**/*.stories.ts + admin_dashboard/src/**/*.stories.ts) |
docs/getting-started/overview.md | "32 mutations and 20+ queries registered" | Actual count: 72 mutation files in rails_api/app/graphql/mutations/ |
docs/getting-started/overview.md | "20 badges" | UserAction enum: 30 entries |
docs/index.md | "Storybook 118+ component stories" | Actual count: 116 |
docs/brand/component-library.md | "Storybook 118+ stories" | Same correction |
Changes made (this audit)
Created
- [x]
docs/milestones/v1.6-audit-remediation.md— full milestone page (5 phases, 18 plans, 31 reqs) - [x]
docs/milestones/v1.7-admin-evolution.md— full milestone page (6 phases, role system, self-health, observability) - [x]
docs/milestones/v1.8-onboarding-wizard.md— full milestone page (6 phases, 19 plans, 44 tasks, 32 reqs)
Updated
- [x]
docs/milestones/v1.5-domain-events.md—status: Shipped,date_shipped: 2026-04-15, body rewritten to past tense, requirements marked 32/32 satisfied - [x]
docs/milestones/README.md— added v1.6, v1.7, v1.8 rows; flagged Phase 38 as the active post-v1.8 phase - [x]
docs_site/.vitepress/config.ts— sidebar updated with v1.6, v1.7, v1.8 entries; v1.5 no longer flagged "(active)" - [x]
docs/product/north-star.md— footer corrected - [x]
docs/product/mission.md— footer corrected - [x]
docs/product/admin-evolution-prd.md— footer corrected - [x]
docs/product/standalone-admin-app-prd.md— footer corrected - [x]
docs/company/workforce-strategy.md— footer corrected - [x]
docs/product/roadmap.md— Item 12 entity language; Item 19 marked shipped withWhat shippedblock; "Last updated" → 2026-04-25; engineering milestones (v1.5–v1.8) + Phase 38 referenced; companion-doc note pointing to milestones index - [x]
docs/getting-started/overview.md— Storybook 116+, mutations 70+ / queries 25+, badges → 30 user-action milestones - [x]
docs/index.md— Storybook count: 118+ → 116+ - [x]
docs/brand/component-library.md— Storybook count: 118+ → 116+
Source-of-truth verification
Every numeric or factual claim updated this round was checked against:
.planning/MILESTONES.md(milestone history).planning/ROADMAP.md+.planning/STATE.md(active phases)git logfor shipped feature commits (e.g.,2a24447afor Accountability Partners,d1617bfffor entity correction)rails_api/app/models/user_action.rb(badge/UserAction enum count)rails_api/app/graphql/mutations/**/*.rb(mutation file count)ionic_frontend/src/**/*.stories.ts+admin_dashboard/src/**/*.stories.ts(Storybook count)docs/company/legal-and-policies.md+docs/company/public-benefit-operating-agreement.md(entity authoritative copy)
Known gaps (tracked, not blocking)
- Phase 38 visual roadmap — not yet folded into
docs/product/roadmap-visual.md(mermaid timeline). Not user-blocking; the textual roadmap references Phase 38. docs/milestones/v1.4-ai-workforce.md— pre-dates this audit; if v1.4-specific drift surfaces it should be addressed in the next audit cycle.- PostHog activation-lift validation (v1.8 Phase 36) — flagged
human_needed; numeric lift only measurable post-deploy. Not a docs gap. - Physical-device a11y verification (v1.8 Phase 37) — flagged
human_needed; emulator-only coverage insufficient. Not a docs gap. docs/product/north-star.md"Phases 1-3.5 shipped" — narrative now omits that Phase 4 Feature 1 (Accountability Partners) shipped. Left intentionally; the north-star reads at strategic granularity, and the product roadmap is the per-feature record.
Metrics
| Category | Before | After |
|---|---|---|
| Milestone pages on docs site | 6 (v1.0–v1.5, v1.5 mis-flagged) | 9 (v1.0–v1.8 all shipped, accurate frontmatter) |
| Vitepress sidebar milestone entries | 6 | 9 |
| "Public Benefit Company, Chicago" footer drift | 5 docs | 0 |
| Roadmap items mis-flagged unshipped | 1 (Item 19) | 0 |
| Storybook count drift | 3 docs (118+ / 56+ / 116 actual) | 0 (all → 116+) |
| GraphQL count drift | 1 doc (32 mutations claimed; 72 actual) | 0 |
| Badge count drift | 1 doc (20 badges claimed; 30 UserActions actual) | 0 |
| Files updated this round | — | 13 |
| Files created this round | — | 3 |
Audit 2026-04-13 — Initial baseline
Audit performed: 2026-04-13. Preserved here as historical record.
The docs/ directory contains 101 markdown files across 11 sections, supported by 219 asset files (SVGs, images, previews). The documentation is well-organized with clear thematic hierarchy and navigation index files.
Overall quality: 8.5/10 — Structure and comprehensiveness are strong. This audit addressed the gaps found.
Changes Made (2026-04-13 audit)
Fixed
- [x] CLAUDE.md: Added
admin_dashboard/,design_system/,docs_site/,gcp_setup/,android_apks/to project structure tree - [x] CLAUDE.md: Removed non-existent
src/stores/references, updated state management docs to reflect composables pattern - [x] CLAUDE.md: Added Admin Dashboard architecture section, commands, and env vars
- [x] CLAUDE.md: Updated app count (three -> four) and version (3.4.4 -> 3.6.1)
- [x]
docs/features/onboarding-timeline.md: Replaced "TBD" activation rate target with "> 60%" - [x]
docs/operations/ai-runbook.md: Fixed broken relative path (../../docs/operations/testing.md->./testing.md) - [x]
docs/brand/component-library.md: Updated story count (56 -> 118+) — superseded 2026-04-25: corrected to 116+ - [x]
docs/index.md: Updated Storybook story count (30+ -> 118+) — superseded 2026-04-25: corrected to 116+
Expanded
- [x]
docs/operations/index.md: Expanded from 10 lines to full section with links, quick reference table, and key commands - [x]
docs/guides/admin-dashboard.md: Added AI Workforce, Review Queue, Employee Detail, and Run Detail sections - [x]
docs/features/index.md: Added AI section and expanded Admin section with proper cross-references
Created
- [x]
CONTRIBUTING.md— Contributor guide (workflow, standards, testing, architecture quick reference) - [x]
ionic_frontend/README.md— Full README replacing Vite placeholder - [x]
admin_dashboard/README.md— Full README with architecture, features, setup - [x]
agent_runner/README.md— Full README with API docs, architecture, execution flow - [x]
design_system/README.md— README with design token documentation and project status - [x]
docs/guides/index.md— Missing section index - [x]
docs/development/index.md— Missing section index
Hierarchy Recommendations (2026-04-13)
Current Structure (Good)
docs/
├── index.md # Landing page
├── getting-started/ # Onboarding
├── architecture/ # System design + DDD
├── features/ # Feature docs by category
├── operations/ # Deploy, test, monitor
├── product/ # PRDs, roadmap, competitive
├── brand/ # Visual identity, logos
├── development/ # Code standards
├── company/ # Legal
├── guides/ # Operational guides
├── milestones/ # Project history (added 2026-04-16, populated through 2026-04-25)
└── assets/ # ScreenshotsSuggested Additions — All Completed (2026-04-13)
- [x]
docs/architecture/admin-dashboard.md— Component architecture, GraphQL catalog, auth flow, polling strategy - [x]
docs/architecture/agent-runner.md— Execution lifecycle, MCP pipeline, brand-voice filter, webhook contract, OIDC auth - [x]
docs/operations/incident-response.md— Solo-operator runbook with diagnosis flow, rollback tiers, common failure modes - [x]
docs/operations/agent-runner-ops.md— Deployment, monitoring, troubleshooting, scaling considerations - [x]
docs/architecture/api-versioning.md— Versioning strategy, GraphQL evolution approach, when to introduce URL versioning - [x]
docs/development/migration-guide.md— Clerk auth migration case study, template for future migrations - [x]
docs/product/competitive/index.md— Note: roadmap.md references a plannedcompetitive-analysis.md. The competitive/ directory has comprehensive analysis already; the roadmap reference is a future deliverable.
Structural Improvements — Completed
Testing.md consolidation: Verified — only docs/development/testing.md exists (559 lines). docs/operations/testing.md does not exist. Fixed the operations/index.md link to point to ../development/testing.md.
AI docs consolidation: Added AI sub-index to docs/features/index.md grouping ai-coach, ai-check-in-prompts, and ai-workforce docs. Operations AI docs (ai-runbook, agent-runner-ops) linked from operations index.
Company docs: Added prominent "DRAFT — NOT LEGALLY REVIEWED" banner to docs/company/public-benefit-operating-agreement.md.
Metrics (2026-04-13)
| Category | Before | After |
|---|---|---|
| README files (placeholder) | 3 | 0 |
| Missing index files | 2 | 0 |
| Broken links | 2 | 0 |
| Undefined metrics (TBD) | 1 | 0 |
| Undocumented directories | 4 | 0 |
| CLAUDE.md discrepancies | 5 | 0 |
| Architecture docs (new services) | 0 | 3 (admin-dashboard, agent-runner, api-versioning) |
| Operations docs (new) | 0 | 2 (incident-response, agent-runner-ops) |
| Development docs (new) | 0 | 1 (migration-guide) |
| Legal doc status | Unmarked draft | DRAFT banner added |
| New files created (total) | — | 15 |
| Files modified (total) | — | 14 |
Last updated: 2026-05-04